    From a development perspective, each iteration provides an increment of functionality to the product. Thus, the
    end of each iteration corresponds to a checkpoint where the project team demonstrates to stakeholders that the
    objectives for that iteration have been met.
 
    From a management perspective, the software lifecycle is decomposed over time into four sequential phases, each
    concluded by a major milestone [BOE95]. There are four major milestones that provide evaluation criteria at the end
    of each phase:
 
    The phases and milestones of a project
   
    Each phase is a span of time between two major milestones and has specific focus and objectives. At the end of
    each phase, an assessment is performed to determine whether the objectives of the phase have been met. A satisfactory
    assessment allows the project to move to the next phase. When a milestone is not met, more iterations in the current
    phase may be performed before the milestone can be considered complete. Achieving a milestone represents an objective
    criteria with which to measure progress.
 
    At the end of the 初始阶段 is the first major project milestone, or Lifecycle
    Objectives Milestone. At this point, you examine the cost versus benefit of the project and decide either to
    proceed with the project or to cancel it.
 
    At the end of the 细化阶段 is the second important project milestone, the
    Lifecycle Architecture Milestone. At this point, a baseline of requirements is agreed to, you examine
    the detailed system objectives and scope, the choice of architecture, and the resolution of the major risks. The
    milestone is achieved when the architecture has been validated.
 
    At the end of the 构造阶段 is the third important project milestone,
    the Initial Operational Capability Milestone. At this point, the product is ready to be handed over to
    the transition team. All functionality has been developed and all alpha testing (if any) has been completed. In
    addition to the software, a user manual has been developed, and there is a description of the current release. The
    product is ready for beta testing.
 
    At the end of the 交付阶段 is the fourth important project milestone,
    the Product Release Milestone. At this point, you decide if the objectives were met and whether you
    should start another development cycle. The Product Release Milestone is the result of the customer reviewing and
    accepting the project deliverables.
 |